Roofer quote template
Roofing quotes should split the visible scope from anything that depends on what you find when the tiles come off. Battens, felt and rotten timbers are the classic 'extras' — flag them up front.
Skip the template — build this roofer quote in 60 seconds.
Branded PDF, one-tap accept, and instant invoice. Free trial, no card needed.
What to include in a roofer quote
- Scaffolding hire and duration
- Tiles / slates / membrane / battens
- Removal and disposal of old roof
- Provisional sums for hidden timber replacement
- Insurance / guarantee (e.g. 10-year workmanship)
Example roofer quote
Realistic UK numbers — swap for your own rates. All prices in GBP, VAT shown at 20%.
| Description | Qty | Unit | Price | Total |
|---|---|---|---|---|
| Scaffolding — 3 weeks hire | 1 | job | £950.00 | £950.00 |
| Strip existing roof & skip disposal | 1 | job | £850.00 | £850.00 |
| Marley Modern concrete tiles + Klober membrane | 95 | m² | £42.00 | £3,990.00 |
| Treated battens (25x50) fixed to spec | 95 | m² | £8.00 | £760.00 |
| Labour — 2 roofers, 8 days | 16 | days | £240.00 | £3,840.00 |
| Provisional: rotten timber replacement (if needed) | 5 | m | £45.00 | £225.00 |
| Subtotal | £10,615.00 | |||
| VAT (20%) | £2,123.00 | |||
| Total | £12,738.00 | |||
Typical roofer jobs to quote
- Full roof strip & re-tile
- Chimney repoint & flashing
- Flat roof — new GRP fibreglass
- Ridge tile re-bed
Roofer quote FAQs
How much does a full re-roof cost in the UK?
A typical 3-bed semi re-roof runs £6,000–£10,000 depending on tile choice, pitch, scaffolding and any timber replacement. Slate roofs are notably higher.
Should I include scaffolding in the quote?
Yes — always as its own line. It's a chunky cost and hiding it in labour makes your total look inflated to a customer comparing quotes.
Skip the template — build this roofer quote in 60 seconds.
Branded PDF, one-tap accept, and instant invoice. Free trial, no card needed.